|
|
 |
| Quality Control |

QC/Technical Support
We train our staff and supervise them during production.
In order to guarantee the quality of the goods, we have
training for all staff. At the same time, we insist on strict
QC when testing.
QC Staff
50 to 59 One of the first high-speed dynamometers in
mainland China
Procedures/testing Details
We strive to meet international standards for
all ourproducts so we ensure that each item
we makeadheres to a premium quality
standard. Our QC operations help better
product efficiency and safety.
|
 |
 |
 |
| Emission Analyzer |
Brake test bed |
On-line emission test chamber |
 |
 |
 |
| Durable magneto-Taiwan |
AC power dynamometer |
Center for Physics and Chemistry |
 |
 |
 |
| Hall |
Coordinate Measuring Instrument |
Training Center |
|
|